Public Comment Form

Commenting open: November 07, 2022 12:00AM CT - December 07, 2022 11:59PM CT.

Xcel Energy - Monticello Nuclear Generating Facility - Wastewater Permit

We invite you to comment on the draft wastewater permit for the Xcel Energy - Monticello nuclear generating facility.

This permit allows Xcel Energy - Monticello nuclear generating facility to discharge treated wastewater to the Mississippi River. Water used at the plant for cooling and fire protection is withdrawn from wells and the Mississippi River, is treated after use before being discharged back to the Mississippi River. A number of new pollutant limits and monitoring regulations were added to the permit.

Wastewater from industrial and commercial sources may contain pollutants at levels that could adversely affect the water quality in area wetlands, streams, rivers, and lakes. Water quality permits - or National Pollutant Discharge Elimination System (NPDES) permits - establish specific limits and requirements to protect Minnesota's surface and groundwater quality. All wastewater must be treated before it goes into surface water to protect human health and aquatic life. Permits are regularly reviewed and updated as they expire, allowing the MPCA to incorporate new information about the impacts of pollutants on the environment in future permits.


Contact Information

All fields are optional unless otherwise indicated.

Submitted by Value

First Name (Required)

Last Name (Required)

Address (Required)

City (Required)

State

ZIP (Required)

Email

Your Comment


Thank you for providing feedback on this project. We value your comments and will use them to assess this project further. Please submit your comments and feedback before the end of the comment period.


If you want to submit a letter, you can upload the letter on this website or submit it via US Mail to the following address:


Minnesota Pollution Control Agency
c/o Katherine Jardine
525 Lake Ave South
Duluth, MN 55802

*Uploading a file is optional*

You may attach up to five 30 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx. If you experience technical difficulties submitting your comment, please contact the person listed at the bottom of this page.


Thank you for subscribing to the Xcel Energy - Monticello Nuclear Generating Facility - Wastewater Permit mailing list.